Client: Buckingham Group Contracting Ltd
Value: £3,300,000.00
Works Package:
Construction of the internationally renowned indoor water facility known as The Wave, Coventry.
Groundworks and Drainage.
The following Reinforced Concrete Structures:
- Foundations.
- Plantroom Raft Foundation Slab and Retaining Walls.
- Holding Tanks.
- Squash Court Raft Foundation Slab and Retaining Walls.
- 25m Public Swimming Pool.
- Power Float Finish Ground Bearing Slabs.
- Power Float Finish Concrete Slabs to Suspended Floors.
- Lazy River Pool Structure with Balancing Tank Structure.
- Plunge Pool Structure with Balancing Tank Structure.
- Wave Pool Structure with Balancing Tank Structure.
- Ramp Walls and Steps.
Quantities:
- 1350.00 m of foul and storm-water drainage
- 4,200 m2 of membrane
- 1,200 cu m of cart away material
- 1780.00 cu m concrete
- 1,880.00 cu m of Xypex waterproof concrete to Pool Structures Slabs and Walls
- 715.00 tn reinforcement
- 9780.00 m2 Reinforced Concrete Floor Slabs
- 9,780.00 m2 of power float finish slabs
- 580.00 m2 of column formwork
- 9,780.00 m2 of wall formwork straight and radius